Completedتکمیل شده

Golgohar Line 5.6.7 Concentrate Quality Improvementپروژه خط 5 و 6 و 7 کنسانتره سنگ آهن گل گهر

Golgohar Line 5.6.7 Concentrate Quality Improvement

17. Gol Gohar Iron Ore Concentrate Lines 5, 6 and 7 Project

Electrical and Instrumentation Installation and Commissioning

Main Employer Gol Gohar Mining and Industrial Company

Employer Fakoor Sanat Tehran

Main Contractor Machine Sazi Vijeh

Execution Period 1401-02

Gol Gohar’s fifth, sixth and seventh iron concentrate lines, with a total production capacity of 6 million tons,

were commissioned in 1394 and 1396. A concentrate-quality improvement and capacity-increase project was

awarded in 1397 to Fakoor Sanat Engineering on an EPC basis. Farzan Fan Andish Farda and Rastak Pouya

served as contractors responsible for installation and commissioning of the electrical, control and

instrumentation systems.

17. پروژه خط 5 و 6 و 7 کنسانتره سنگ آهن گل گهر

نصب و راه اندازی برق و ابزار دقیق

کارفرمای اصلی: شرکت معدنی صنعتی گل گهر

کارفرما: فکورصنعت تهران

پیمانکار اصلی: ماشین سازی ویژه

زمان اجرا: 02-1401

معرفی پروژه:

خطوط پنجم، ششم و هفتم تولید کنسانتره آهن گل گهر مجموعاً با ظرفیت تولید 6 میلیون تن در سال های 1394 و 1396 به بهره برداری رسیدند. پروژه بهبود کیفیت محصول کنسانتره و افزایش ظرفیت تولید در سال 1397 به صورت EPC به شرکت مهندسی فکورصنعت واگذار شد.

شرکت های فرزان فن اندیش فردا و رستاک پویا به عنوان پیمانکار، مسئولیت عملیات نصب و راه اندازی سیستم های برق، کنترل و ابزاردقیق پروژه را به عهده داشتند.

Project dataاطلاعات پروژه

Clientکارفرما
Fakoor Sanat TehranFakoor Sanat Tehran
Locationموقعیت
Sirjanسیرجان
Yearسال
1401-021401-02
Portfolio categoryدسته‌بندی
Mineral Industriesصنایع معدنی
Scopeمحدوده
Cدر حال اجرا

Delivery scopeمحدوده تحویل

Execution Packageبسته اجرایی

  • اجرای برق و ابزاردقیقاجرای برق و ابزاردقیق