43. Chabahar Power Plant Substation

Electrical BOP Installation and Pre-commissioning

Main Employer Saba Power and Energy

Main Employer Consultant Ghods Niroo Company

Main Contractor MAPNA Development 2

Execution Period 1399-1400

Chabahar Power Plant, with a capacity of 415 MW, has been in operation since 1387 and transfers generated

power to the grid through a 230 kV GIS substation. With the construction of a steam unit to convert the gas

plant to combined cycle, a substation expansion was required. Based on the design, this was done through

modifications to the existing GIS substation and the addition of one AIS feeder; responsibility for this work

rested with Rastak Pouya.

43. پست نیروگاه چابهار

نصب و پیش راه اندازی BOP برق

کارفرمای اصلی: برق و انرژی صبا

مشاور کارفرمای اصلی: شرکت قدس نیرو

پیمانکار اصلی: مپنا توسعه 2

زمان اجرا: 1400-1399

معرفی پروژه:

نیروگاه چابهار با ظرفیت ۴۱۵ مگاوات از سال 1387 در حال بهره برداری بوده است و از طریق پست GIS با سطح ولتاژ ۲۳۰ کیلوولت انرژی تولیدی آن به شبکه منتقل می‌شود.

با توجه به احداث یک واحد بخار به منظور تبدیل نیروگاه گازی به سیکل ترکیبی، لازم بود طرح توسعه پست اجرا شود. لذا بر اساس طراحی انجام شده، با تغییراتی در پست GIS موجود و اضافه کردن یک فیدر AIS این کار انجام شد که مسئولیت آن با شرکت رستاک پویا بود.

Project dataاطلاعات پروژه

Clientکارفرما
Saba Power and EnergySaba Power and Energy
Locationموقعیت
Chabaharچابهار
Yearسال
1399-14001399-1400
Portfolio categoryدسته‌بندی
HV Substationsپست و خطوط انتقال
Scopeمحدوده
PCتامین و اجرا

Delivery scopeمحدوده تحویل

Execution Packageبسته اجرایی

  • تامین، نصب و راه اندازیتامین، نصب و راه اندازی