Golgohar Line 4 Concentrate Quality Improvementپروژه خط چهارم کنسانتره سنگ آهن گل گهر

16. Gol Gohar Iron Ore Concentrate Line 4 Project
Electrical, Control and Instrumentation Systems Installation and Commissioning
Main Employer Gol Gohar Mining and Industrial Company
Employer Fakoor Sanat Tehran
Main Contractor Machine Sazi Vijeh
Execution Period 1400-01
Gol Gohar’s fourth iron concentrate production line (Polycom), with a production capacity of 2 million tons,
was commissioned in 1390. A quality-improvement and capacity-increase project for the concentrate
product was awarded in 1398 to Fakoor Sanat Engineering as an EPC contract. Rastak Pouya served as
contractor for installation and commissioning of the project’s electrical, control and instrumentation
systems.
16. پروژه خط چهارم کنسانتره سنگ آهن گل گهر
نصب و راه اندازی سیستم های برق، کنترل و ابزاردقیق
کارفرمای اصلی: شرکت معدنی صنعتی گل گهر
کارفرما: فکورصنعت تهران
پیمانکار اصلی: ماشین سازی ویژه
زمان اجرا: 01-1400
معرفی پروژه:
خط چهارم تولید کنسانتره آهن (پلی کام) گل گهر با ظرفیت تولید 2 میلیون تن، در سال 1390 به بهره برداری رسید. پروژه بهبود کیفیت محصول کنسانتره و افزایش ظرفیت تولید در سال 1398 به صورت EPC به شرکت مهندسی فکورصنعت واگذار شد.
شرکت رستاک پویا به عنوان پیمانکار، مسئولیت عملیات نصب و راه اندازی سیستم های برق، کنترل و ابزاردقیق پروژه را به عهده داشت.
Project dataاطلاعات پروژه
- Clientکارفرما
- Fakoor Sanat TehranFakoor Sanat Tehran
- Locationموقعیت
- Sirjanسیرجان
- Yearسال
- 1400-011400-01
- Portfolio categoryدستهبندی
- Mineral Industriesصنایع معدنی
- Scopeمحدوده
- Cدر حال اجرا
Delivery scopeمحدوده تحویل
Execution Packageبسته اجرایی
- اجرای برق و ابزاردقیقاجرای برق و ابزاردقیق