Golgohar Line 5.6.7 Concentrate Quality Improvementپروژه خط 5 و 6 و 7 کنسانتره سنگ آهن گل گهر

17. Gol Gohar Iron Ore Concentrate Lines 5, 6 and 7 Project
Electrical and Instrumentation Installation and Commissioning
Main Employer Gol Gohar Mining and Industrial Company
Employer Fakoor Sanat Tehran
Main Contractor Machine Sazi Vijeh
Execution Period 1401-02
Gol Gohar’s fifth, sixth and seventh iron concentrate lines, with a total production capacity of 6 million tons,
were commissioned in 1394 and 1396. A concentrate-quality improvement and capacity-increase project was
awarded in 1397 to Fakoor Sanat Engineering on an EPC basis. Farzan Fan Andish Farda and Rastak Pouya
served as contractors responsible for installation and commissioning of the electrical, control and
instrumentation systems.
17. پروژه خط 5 و 6 و 7 کنسانتره سنگ آهن گل گهر
نصب و راه اندازی برق و ابزار دقیق
کارفرمای اصلی: شرکت معدنی صنعتی گل گهر
کارفرما: فکورصنعت تهران
پیمانکار اصلی: ماشین سازی ویژه
زمان اجرا: 02-1401
معرفی پروژه:
خطوط پنجم، ششم و هفتم تولید کنسانتره آهن گل گهر مجموعاً با ظرفیت تولید 6 میلیون تن در سال های 1394 و 1396 به بهره برداری رسیدند. پروژه بهبود کیفیت محصول کنسانتره و افزایش ظرفیت تولید در سال 1397 به صورت EPC به شرکت مهندسی فکورصنعت واگذار شد.
شرکت های فرزان فن اندیش فردا و رستاک پویا به عنوان پیمانکار، مسئولیت عملیات نصب و راه اندازی سیستم های برق، کنترل و ابزاردقیق پروژه را به عهده داشتند.
Project dataاطلاعات پروژه
- Clientکارفرما
- Fakoor Sanat TehranFakoor Sanat Tehran
- Locationموقعیت
- Sirjanسیرجان
- Yearسال
- 1401-021401-02
- Portfolio categoryدستهبندی
- Mineral Industriesصنایع معدنی
- Scopeمحدوده
- Cدر حال اجرا
Delivery scopeمحدوده تحویل
Execution Packageبسته اجرایی
- اجرای برق و ابزاردقیقاجرای برق و ابزاردقیق