Completedتکمیل شده

Khorramabad 230KV Substationپست 230 کیلوولت نیروگاه خرم آباد

Khorramabad 230KV Substation

42. Khorramabad Power Plant 230 kV Substation

Electrical BOP Installation and Pre-commissioning

Main Employer Khorramabad Power Generation Company

Employer MAPNA Development 2

Main Contractor Hirbod Niroo

Execution Period 1398

Khorramabad Combined Cycle Power Plant, comprising two gas units and one steam unit with a capacity of

484 MW, was built near Khorramabad by MAPNA Group. To transfer generated energy to the national grid, a

230 kV AIS substation with three bays was required. Rastak Pouya Engineering was responsible for

procurement of part of the equipment and installation and commissioning of the substation, which was put

into operation in 1398.

42. پست 230 کیلوولت نیروگاه خرم آباد

نصب و پیش راه اندازی BOP برق

کارفرمای اصلی: شرکت تولید نیروی خرم آباد

کارفرما: مپنا توسعه 2

پیمانکار اصلی: هیربدنیرو

زمان اجرا: 1398

معرفی پروژه:

احداث نیروگاه سیکل ترکیبی خرم آباد شامل دو واحد گازی و یک واحد بخار به ظرفیت 484 مگاوات در نزدیکی شهر خرم آباد توسط گروه مپنا انجام شد. برای انتقال انرژی تولیدی به شبکه سراسری نیاز به احداث یک پست AIS با سطح ولتاژ 230 کیلوولت شامل سه بی بوده است. شرکت مهندسی رستاک پویا مسئولیت خرید بخشی از اقلام و نصب و راه اندازی پست مذکور را به عهده داشته است که در سال 1398 به بهره برداری رسید.

Project dataاطلاعات پروژه

Clientکارفرما
MAPNA Development 2MAPNA Development 2
Locationموقعیت
Khorramabadخرم آباد
Yearسال
13981398
Portfolio categoryدسته‌بندی
HV Substationsپست و خطوط انتقال
Scopeمحدوده
PCتامین و اجرا

Delivery scopeمحدوده تحویل

Execution Packageبسته اجرایی

  • تامین، نصب و راه اندازیتامین، نصب و راه اندازی
Scroll to Top